Locations Completed: 238
Timeframe: 2.5 weeks
Completion Date: March 2007
Partner Since: 2006
H.J. Martin and Son performed installs at 238 stores in three weeks, with only two weeks to complete work at all locations.
The work included installing display tables, slat wall panels, benches, accessory walls, graphic boards and eliminating fixtures not consistent with Sprint’s image.
H.J. Martin and Son received material delivered at centralized regions and transported the material to each project location to meet the fast-paced schedule.